MUDMAN: Drilling Mud Recycling System
MUDMAN
- Applications: Geothermal Drilling
Previous
Next
Previous
Next
The MUDMAN is a compact, track-mounted geothermal drilling mud recycling system designed to improve drilling efficiency, reduce operating costs, and minimize environmental impact. Engineered for geothermal and water well drilling applications, the MUDMAN features an advanced three-stage mud separation system that combines a conveyor belt, 10-inch hydrocyclone, and shale shaker to remove gravel, clay, sand, and silt from drilling fluids. By efficiently separating solids and recovering reusable drilling mud, the MUDMAN helps geothermal drilling contractors reduce freshwater consumption, lower bentonite and polymer costs, minimize drilling waste, and maintain cleaner jobsites. Its self-contained design and crawler-mounted mobility make it an ideal drilling mud management solution for residential and commercial geothermal drilling projects.
Your Next Drilling Solution Starts Here with the MUDMAN: Drilling Mud Recycling System
Features & Specifications
Diesel Engine
- 71.1 HP
Pump to Cyclone Flow
- 528 GPM
Tank Capacities
- Diesel Tank: 37.2 gal
- Hydraulic Tank: 29.1 gal
- Mud Tank: 330 gal
Dimensions
- Weight: 7,937 lbs
- Length: 10 ft
- Width: 8.35 ft
- Height: 12.48 ft
Options & Upgrades
Request a Quote
Ready to bring the MUDMAN: Drilling Mud Recycling System to your fleet? Let’s talk specs, delivery timelines, and custom configuration options that match your next project.
"*" indicates required fields